French electrical infrastructure group Legrand UK and Ireland has opened a new 43,000 sq ft electronics manufacturing facility at Nelson Park in Cramlington, Northumberland, establishing a new centre of excellence for the Legrand Group in Europe. BDC Magazine reported on the opening, confirmed on 27 May 2026.
The purpose-built site is home to Legrand's CP Electronics lighting controls and Legrand Care brands, and extends the company's manufacturing presence in the UK, which spans more than 40 years. The facility is positioned close to the North East's growing clean energy sector and skilled workforce.
Designed and built with net zero principles at its core, the facility is entirely gas-free. A high-efficiency air source heat pump system provides heating and cooling across the site, eliminating direct Scope 1 emissions.
A rooftop solar PV array with an installed capacity of 163 kilowatt-peak is expected to generate close to 128,000 kWh annually, significantly reducing reliance on grid electricity. The site also incorporates EV charging infrastructure, sustainable drainage, permeable paving, and high-performance insulation.
Wherever possible, the facility has been equipped with Legrand's own products, including its Linea 5000 door entry panels, cable management solutions, and digital energy metering technology, serving as a working showcase for the company's product portfolio.
Paolo Murdocca, COO at Legrand UK and Ireland, said: "This facility represents a significant milestone for Legrand in the UK. We have built a site that not only strengthens our manufacturing capability but also reflects the standards we set for our customers. Cramlington gives us a modern, sustainable base from which to grow our CP Electronics and Legrand Care brands, and it demonstrates that high-quality electronics manufacturing and genuine environmental responsibility can go hand in hand."
Access the full report on Legrand's Cramlington facility opening here.




.png)
